Module installation


★ When carrying the modules, two hands are required to grasp the modules and keep a level of stability. It is forbidden to shake severely, carry the module by one person, drop the module, pull the connecting line of junction box and handle two and more modules.

★ Place the modules on a flat ground, put the cardboard in the bottom and the glass surface is forbidden to directly touch the ground.

★ When the module is placed on the ground, it is forbidden to stack debris, step on, sit down and make other actions that may cause the deformation for the modules.

★ Do not step on the modules during installation. Do not drop the module on the bracket.

★ When the modules is installed on the buildings or roofs, it is necessary to ensure that they are securely fastened and will not be damaged by strong wind and snow.

★ Ensure that the back of modules good ventilation for cooling the modules.

★ When installing module on the roofs, make sure the roof structure is suitable. In addition, the roofs must be properly sealed to prevent leakage.

★ The gap between the module frame and wall or roof should be 115mm at least. If there are other installation methods, it may affect assessment of fire rating.

★ The spacing between two modules should be at least 10mm

★ The installation should not block the module's drain hole.